Current Projects
 


Rocker repaired and ready to be bonded back in

Firewall bonded in

Tub broken loose from old accident

Door gutters installed and primed

Firewall prepped for final fit and installation

Panels prepped for installation

Body panels cleaned up and ready for installation

Rocker and door post installed, fitting replacement firewall

Damaged firewall removed, fitting rocker panel

Damaged rocker and door post removed

Job # on the birdcage. Someone's old torch and welder work

Birdcage damage through the Z bar

Cowl Damage, spliced in panels

Birdcage damage

Quarter and Taillight panel removed to repair damage

Gill, Door, Quarter pulled to repair damaged areas

Rocker Damaged

Checking the Frame

Stripping paint

Pulling Body

Posted @ 4:13 PM